Installation
 
The follow video is the installation of wood mineralized board.
 

這個頁面上的內容需要較新版本的 Adobe Flash Player。

取得 Adobe Flash Player

 
Measuring
Quantity Counting
Material Ordering
Sample Making
U-Channd Setting (Upper & Lower)
H-Stud Setting
Wood Mineralized Board Assembling
Ditch Cutting (For Pipelines)
Pipe Arranging
Reinforce Net Installing
Coating (Cement Mortar or Liquid  Spraying)
Polishing or Tile or Others
 
 
Tel : +886-2-2752-6181    Fax : +886-2-2752-6096   Email : hpb.tech@msa.hinet.net 
Copyright © 2011 HPB All rights reserved. By Eastern Design